A selection of recent international projects (outside Fiji) undertaken by Dick Watling or Environment Consultants are listed below, divided into four categories:
- Protected Area Management, Biodiversity and Resource Surveys
- Environmental Effects, Impact and Management;
- Forestry; and,
- Others including Project Formulation and Reviews; Ecotourism etc.
| Protected Area Management, Resource Surveys and Biodiversity |
| 2002 |
International Environment Specialist Desk Review Assessing Linkages between Biodiversity Conservation and Poverty Alleviation. World Bank. Duration 0.75 months. |
| 2002 |
Tonga Biological Coordinator - Maninita Island Sanctuary project, Vava'u. Coordinated the removal of rats by Dept. of Conservation New Zealand specialist and Tongan counterparts. Project duration 2.0 months. |
| 2001 |
Tonga Wildlife Ecologist and Protected Area Management Specialist Preliminary Survey of Maninita Island, Vavau to determine potential as a wildlife sanctuary and/or ecotourism (March 2001). Followed by a full Baseline Survey in November 2002. Commissioned by Tourism Resource Consultants, Wellington, on behalf of New Zealand Overseas Development Administration. Duration 0.5 months. |
| 2001-2 |
Lao PDR, Vietnam, Cambodia, Thailand Review of Lower Mekong River Protected Areas and their role in Economic Development. ICEM. |
| 2001 |
Tonga Baseline Survey of Maninita Island, Vavau. NZODA. |
| 2001 |
Tonga Preliminary Survey of Maninita Island, Vavau to determine potential as a wildlife sanctuary and/or ecotourism. NZODA. |
| 1999 |
Kiribati Review of the Wildlife Conservation Unit on Kiritimati Island, survey of the seabird breeding colonies and design of a conservation management and capacity-raising project South Pacific Regional Environmental Programme. |
| 1998 |
Tuvalu Wildlife Ecologist terrestrial fauna survey of the Funafuti Marine Conservation Area. Commissioned by SPREP for the South Pacific Biodiversity Conservation Programme. |
| 1998 |
Lao PDR - Project Coordinator - Social Action Plan for the Nakai Nam Theun Conservation Area. IUCN for the World Bank. |
| 1998 |
Lao PDR - Nakai Nam Theun Conservation Area Phase 2 Activities - 1998. Review and design mission for the World Bank. Duration 0.75 months. |
| 1996 - 1997 |
Lao PDR - Team Leader - Environmental and Social Action Plan for the Nakai Nam Theun Conservation Area. World Bank required study for the Nam Theun 2 Hydropower Project. |
| 1996 |
Cambodia - Review of the Draft Management Plan for the Preah Sihanouk NP, UNDP. |
| 1990-91 |
Indonesia - Fauna and habitat specialist in a World Bank TA Consultant Team undertaking a project to upgrade management in five National Parks |
| 1981 |
Indonesia - As Wildlife Biologist with a World Wildlife Fund team undertook a survey of the Kayan-Mentarang Reserve, East Kalimantan. |
| 1978-81 |
Project Leader - World Wildlife Fund Project 1526: Lore Lindu National Park, Central Sulawesi, Indonesia. |
| Environmental Impact and Management (Environmental Impact Assessment, Planning, Environmental Management Plans, Audits or Reviews) |
| 1997 |
South Pacific Regional Environmental Management Guidelines for Small Tourist Hotels and Resorts. Commissioned by the Tourism Council of the South Pacific. |
| 1996 |
Malaysia - Environmental Screening Study for the Northport - Westport Highway and Bridge commissioned by HSS Integrated Sdn. Bhd. |
| 1996 |
Malaysia - Environmental Screening Study of the Penang Channel 3rd Crossing, commissioned by Mekar Idaman Sdn. Bhd. |
| 1996 |
Malaysia (Sarawak) - Environmental Management Plan for the contractor of the Bakun Access Road from Batang Kemena to Tubau, Pembinaan Limbongan Setia Sdn. Bhd. |
| 1996 |
Cambodia - Review of the environmental implications of a UN rehabilitation project in Cambodia's northernnmost province, Ratanakiri. UNDP. |
| 1996 |
Malaysia - Environmental Impact Assessment of Pulau Tioman Power Station plant up from an existing 3 MW to 8 MW distillate and medium fuel oil fired open-cycle generators. TNB. |
| 1996 |
Malaysia - Preliminary Environmental Impact Assessment of proposed highway construction through the North Selangor Peat Swamp Forest, for a private consortium. |
| 1996 |
Malaysia - Emergency Response Plan (ERP), Sultan Iskandar Power Station, Johore for Tenaga Nasional Berhad. |
| 1995/6 |
Malaysia - Site screening of five sites for MNI Newsprint Sdn. Bhds. proposed Newsprint Mill with an annual production of 300,000 tonnes. |
| 1996 |
Malaysia - Environmental Impact Assessment of Glugor Combined Cycle Power plant up from an existing 138 MW Open Cycle Power Station to 360 MW Combined Cycle. TN Berhad. |
| 1995/6 |
Malaysia - Environmental Impact Scoping Study of the 250 km West Coast Expressway for a private consortium. |
| 1995 |
Malaysia - Environmental Audit of the Sultan Salahuddin Abdul Aziz Power Station, Malaysias largest power plant operated by Tenaga Nasional Berhad. |
| 1995 |
Malaysia - Environmental Impact Assessment of a Strong Linerboard Manufacturing Plant for Amcor Malaysia Sdn. Bhd., in Negeri Sembilan. |
| 1995 |
Malaysia - Environmental Impact Assessment for a 2 x 30 MW Co-generation Plant for Tenaga Nasional Engineering Consultancy Sdn. Bhd., in Negeri Sembilan. |
| 1995 |
Malaysia - Environmental Impact Assessment for a granite quarry and crusher for MTD Construction Sdn. Bhd., in Perak. |
| 1995 |
Malaysia - Environmental Scoping for the proposed route of the 40 km Dedicated Highway between Kuala Lumpur and Sepang for HSS Integrated Sdn. |
| 1995 |
Malaysia - Environmental Impact Assessment of the District Cooling Water 30 MW Co-generation Plant, Bangsar for Tenaga Nasional Engineering Consultancy Sdn. Bhd. |
| 1995 |
Malaysia - Project Manager - Environmental Quality Management Programme for for the laying of a 350 km natural gas pipeline, MTD Construction Sdn. Bhd. |
| 1994 |
Malaysia Preparation of detailed guidelines for EIAs of Key Sector projects. Asian Development Bank |
| 1994 |
Tonga - Environment Specialist in a Team assisting the Government of the Kingdom of Tonga formulate an Agricultural Development Project. Asian Development Bank |
| 1994 |
Cook Islands - Environment Specialist in a Team formulating an Agribusiness and Agro-Industry Development Project. Asian Development Bank. |
| 1993 |
Kiribati - Environment Specialist in the preparation of an Integrated Development Plan for the Northern Line Islands (NLI). Asian Development Bank |
| 1991 |
Cook Islands - Preliminary EIA of a financially troubled and controversial four-star hotel development being built on a `fast-track' and `turn-key' programme. SPREP. |
| 1988 |
Indonesia Review of the environmental issues associated with the Bah Bolon Project, a river training, irrigation and agricultural development project adjacent to the Inalum aluminium smelter, AIDAB |
| 1988-89 |
Indonesia - Environment specialist in a World Bank Technical Assistance team (ANZDEC Consultants) formulating the 1989-1994, Five Year Plan for the Ministry of Transmigration, Government of Indonesia. |
Forestry
|
| 2001 |
Papua New Guinea Team Leader for Forest Management Certification Scoping Assessment of PNG-Canadian Hardwoods Ltd. Central Province, Papua New Guinea. SmartWood Programme Rainforest Alliance. |
| 2001 |
Indonesia Team Leader of a five man team for a Forest Management Certification Assessment of PT Austral Byna's 300,000 ha concession on the Barito River, Central Kalimantan. SmartWood Programme Rainforest Alliance. |
| 1995 |
Indonesia - Biodiversity and Impact Assessment specialist in a five man international team commissioned by CIFOR (Centre for International Forestry Research, Bogor) to undertake the second test of five sets of criteria and indicators for the sustainable management of forests. |
| Others including Project Formulation and Reviews; Ecotourism etc |
| 2000 |
Lao PDR Implementation Completion Report for the Forest Management and Conservation Area Project, a part Global Environment Facility funded project. World Bank |
| 1999 |
Lao PDR Team Leader Preparation of Environmental Inventories for the Provinces of Bolikhamxai, Louang Prabang and Oudomxai. |
| 1995 |
Papua New Guinea - Team Leader of a three man international project review team of UNDPs GEF-funded `Biodiversity Conservation and Resource Management Programme in Papua New Guinea. |
| 1993 |
Samoa UNDP Mission to evaluate the PMI/90/002 (Planning and Implementation of Pacific Regional Environment Programme) and to draw up a project document for a Capacity - 21 Follow up Project. |
| 1993 |
Papua New Guinea - Team Leader Project identification and design Sustainable Livelihoods Fly River Catchment for IUCN - the World Conservation Union. |
| 1987 |
Solomon Islands - Ecologist/Environment Planner nature tourism identification study - EEC funded Tourism Council of the South Pacific's Project. |
|
|